Learn more about Cranbrook Schools - 2:03mins
CRANBROOK SCHOOLS

KINGSWOOD PRESERVATION AND RESTORATION

These funds will ensure that the 75-year-old Saarinen-designed building receives the restorative and protective care necessary to preserve its status as a masterpiece. Kingswood requires restoration and preservation of interior elements, as well as exterior architectural features. Some projects have taken place and the Kingswood Roof repair is under way. Each project will ensure that Kingswood's beauty and functionality continue for generations.

FUNDS RAISED TO DATE: $3 MILLION  | SUPPORT NEEDED: $5 MILLION

 

CRANBROOK QUAD AND OVAL

An architectural centerpiece of the Cranbrook Schools campus is the Quad. Re-beautification of the Quad is an area of great need as this large open space is the main thoroughfare of the Cranbrook campus and is a daily gathering place for students. Along with pavement repairs and the installation of a sidewalk snowmelt system, the project will improve drainage, and repair storm water and sewage lines. The project also includes restoration of the Thompson Oval.

FUNDS RAISED TO DATE: $2.6 MILLION  | SUPPORT NEEDED: $8 MILLION

 

"The real testimony is looking at our alumni and what they have been able to achieve. No matter what the career choice, Cranbrook alumni have made a difference as a result of the kind of experience and education they've had here."

ARLYCE SEIBERT

DIRECTOR, CRANBROOK SCHOOLS

 

FIELD SPORTS

A sports initiative is planned to rejuvenate Cranbrook's athletic fields. It includes improvements to the baseball field including dugouts as well as construction of a new tennis complex.

FUNDS RAISED TO DATE: $682 THOUSAND  | SUPPORT NEEDED: $2 MILLION